Fayl:Stwlan.dam.jpg

Sahifa kontenti boshqa tillarda dastaklanmaydi.
Vikipediya, ochiq ensiklopediya

Stwlan.dam.jpg(750 × 483 piksel, fayl hajmi: 110 KB, MIME tipi: image/jpeg)

Ushbu fayl Vikiomborga yuklangan boʻlib, boshqa loyihalarda ham qoʻllanilishi mumkin. Uning tavsif sahifasidan olingan maʼlumot quyida keltirilgan.

Qisqa izoh

Taʼrif
English: The upper reservoir (Llyn Stwlan) and dam of the Ffestiniog Pumped Storage Scheme in north Wales. The four water turbines at the power station can generate 360 MW of electricity within 60 seconds of the need arising.
Taken by Adrian Pingstone in 1988 and released to the public domain.
Français : Le réservoir supérieur (Llyn Stwlan) et le barrage du "Ffestiniog Pumped Storage Scheme" dans le nord du Pays de Galles. Cette station de production (de faible puissance) dispose de quatre turbines hydrauliques génèrant 360 MW d'électricité dans les 60 secondes. La taille de l'ouvrage peut être jugée en la comparant à la voiture garée en dessous.
Sanasi 2 Iyun 2003 (original upload date)
Manba Transferred from en.wikipedia to Commons.
Muallif Arpingstone at inglizcha Vikipediya

Litsenziyalash

Public domain This work has been released into the public domain by its author, Arpingstone at inglizcha Vikipediya. This applies worldwide.
In some countries this may not be legally possible; if so:
Arpingstone grants anyone the right to use this work for any purpose, without any conditions, unless such conditions are required by law.

Original upload log

The original description page was here. All following user names refer to en.wikipedia.
  • 2003-06-02 19:53 Arpingstone 750×483×8 (112585 bytes) Stwlan Dam

Captions

Add a one-line explanation of what this file represents
A picture of the Stwlan Dam in Wales.

Items portrayed in this file

tasvirlangan ob'ekt

Fayl tarixi

Faylning biror paytdagi holatini koʻrish uchun tegishli sana/vaqtga bosingiz.

Sana/VaqtMiniaturaOʻlchamlariFoydalanuvchiIzoh
joriy14:00, 13-Avgust 200514:00, 13-Avgust 2005 dagi versiya uchun tasvir750 × 483 (110 KB)HellispThe upper reservoir (Llyn Stwlan) and dam of the Ffestiniog Pumped Storage Scheme in north Wales. The four water turbines at the power station can generate 360 MW of electricity within 60 seconds of the need arising.<br> Taken by Adrian Pingstone in 1988

Bu faylga quyidagi sahifa bogʻlangan:

Faylning global foydalanilishi

Ushbu fayl quyidagi vikilarda ishlatilyapti:

Metama’lumot